Contact Sales

Industries / Suppliers and Contractors

Data center intelligence for suppliers and contractors

Know each new project the week it files, size the job, and reach the owner at the right stage.

Use cases

What sales teams can do with Firmwatts

01

Hear about each project first

A filing is the first public sign of a project. You track it the week it appears.

Get an alert on each new filing in your markets

Filter by stage, size and owner

See what changed last week

Newest alerts
MIL05 - Stack InfrastructureCompliance check. Administrative check. Vignate (MI)30 Sep 2026
ML7 and ML8 - EquinixPreliminary evaluation. No further assessment needed. Excluded from VIA. Settimo Milanese (MI)21 Sep 2026
Ponte San Pietro data center - ArubaCompliance check. Concluded. Partly complied. Ponte San Pietro (BG)21 Sep 2026
02

Size the job from the documents

The filings state what the campus needs: generators, thermal power, grid connection and IT load.

Read the number and the power of the generators

See the grid connection and the substation

See which buildings are new

Siziano Campus - Stack Infrastructure: facts from the filing
Generators81At full build. 38 are new.
Thermal power of generators480 MWtWhole campus at full build.
Grid connection132 kVA new high voltage substation for MIL08A, linked to the MIL01 substation.
IT load71.6 MWIT load of the whole campus.
03

Time your offer to the stage

Each stage has its own buyers. Reach the owner when the work you sell comes next.

See the stage and the next milestone of each project

See the parent behind each applicant

Follow your target accounts across markets

Who sells at each stage
Grid requestLand and power advisors
In permittingEngineers and consultants
Environmental clearanceMain contractor. Long lead equipment
Under constructionCooling, fit out and commissioning
OperatingService and maintenance

Example: Siziano Campus - Stack Infrastructure is in permitting. The filing plans 38 new generators.

See the data before you pay.