Contact Sales

Industries / Hyperscalers

Data center intelligence for hyperscalers

Find campuses with power and a permit, validate developer claims, and see where the grid has room.

Use cases

What hyperscale teams can do with Firmwatts

01

Find capacity that will be ready on time

Filter the pipeline for campuses that have a permit in the markets you need.

Filter by stage, IT load, owner and market

See the power date of each campus

Export the list for your team

Market Data
Stage: Environmental clearanceIT load: over 30 MW
ProjectIT loadPower date
ECX MPX33 - EdgeConneX (EQT)Bertonico (LO)300 MW
Rho data center - Amazon (AWS)Rho (MI)79 MW
MXP1 - VantageMelegnano (MI)64 MW
Liscate data center - Stack InfrastructureLiscate (MI)40 MW
MXP2 - VantageSettimo Milanese (MI)32 MW
02

Validate what a developer tells you

Compare the capacity in the pitch with the capacity in the filing. Each fact keeps the exact words of the document.

Read the IT load, the generators and the grid connection

See the page and the quote behind each fact

See which buildings operate and which are planned

Siziano Campus - Stack Infrastructure: one fact

IT load in the filing

71.6 MW

prevede l’insediamento complessivo di circa 71,6 MW di potenza

Non technical summary, page 18.

In operation3 buildings
In construction1 building
Planned2 buildings
03

See where the grid has room

Grid capacity decides where you can grow. Compare the requests in each market before you commit.

Compare the requested GW by market

See how much of it has a contract

Follow the change every month

Grid requests by region
Lombardia
47.26
Piemonte
14.52
Lazio
12.45
Puglia
8.28
Emilia-Romagna
6.14

1.9%

of the 101.36 GW requested in Italy has reached a contract.